Reuse instead of demolishing: carbon-neutral construction.
The project starts from carbon-neutral construction and the idea of reusing the existing building to avoid large-scale demolition. New spaces are inserted into the existing structure, timber storeys are added, and complementary timber buildings are proposed for sustainable offices.
Images











Other projects

CORPORATE
La Tahona Valley
La Tahona, Canelones, Uruguay
BIM coordination of four office buildings, integrating disciplines to detect clashes before construction.

RESIDENTIAL
PAM House
Parque Miramar, Canelones, Uruguay
Construction documents as external architects: 190 drawing sheets and a BIMx model with all the technical documentation.

RESIDENTIAL
NAS House
Uruguay
Single-storey L-shaped house, open to the corner and facing the western sunset.

RESIDENTIAL
DEB House
Parque Miramar, Canelones, Uruguay
Renovation and extension: 230 m² indoors and 45 m² outdoors, with two bedrooms and two bathrooms.

RESIDENTIAL
PH Parque Miramar
Parque Miramar, Canelones, Uruguay
Two 125 m² houses, each with an en-suite bedroom, pergola and barbecue for outdoor living.

RESIDENTIAL
LUC House
Lagos, Canelones, Uruguay
Project developed in BIM, with a navigable BIMx model to walk through the house before building it.

CORPORATE
Seetalplatz, Stadtwerk
Switzerland
Urban structures that create in-between spaces and two squares connecting the city with the river.

RESIDENTIAL
Hünenberg
Hünenberg, Switzerland
Windmill-shaped building: three apartments and a penthouse with open views of the Alps.
Let’s build your next project
Interested in a project like Baarermatte? Tell us your idea and we will get back to you shortly.







